Centorum
Gujranwala Electric Power Company

Procurement Breakdowns

Position at 6 Jun 2026
  
Contracts13
Portfolio valueRs6,350,300,000
Open alerts16
Contract #SupplierDepartmentValueTermOpen
GEPCO/MM/DT-100/2026-14
Chenab Transformers (Pvt) Ltd
Supply of 640 distribution transformers (100 kVA and 200 kVA, 11 kV / 400 V) to circle stores against the annual materials plan. Award flagged: the technical schedule fixes a winding configuration and tank dimension that only one prequalified manufacturer offers, and two of the three bids were non-responsive on that clause alone.
Materials ManagementRs1,840,000,00012 Jan 2026 – 31 Dec 20262 alerts
GEPCO/GRW/OH-RECON/2026-08
Ravi Power Construction Co.
Reconductoring of 46 km of 11 kV overhead line across four feeders in Gujranwala city, including pole replacement and cross-arm renewal. Expenditure booked to repair and maintenance; the completion record describes a rebuilt line on a new route, which is capital work.
Gujranwala Operation CircleRs412,000,0001 Sep 2025 – 31 Aug 20262 alerts
GEPCO/SKT/DW-IND/2026-03
Deposit works
Sialkot Electrical Works
Dedicated 11 kV feeder and outdoor substation for an industrial consumer at Sialkot, carried out as deposit works against an approved demand notice. Expenditure has passed the amount deposited and no revised demand notice has been raised.
Sialkot Operation CircleRs96,400,0002 Feb 2026 – 30 Sep 20262 alerts
GEPCO/GSO/132-BAY/2025-22
Indus Grid Engineering (Pvt) Ltd
Extension of two 132 kV bays at Kamoke grid station, including circuit breakers, isolators, protection panels and civil foundations. Commissioning slipped two quarters; the extension of time is on file but the performance guarantee was not extended with it.
Grid System OperationRs1,310,000,00010 Mar 2025 – 30 Sep 20261 alerts
GEPCO/MM/AMI-MTR/2026-09
Punjab Metering Systems (Pvt) Ltd
Supply of 120,000 single-phase static energy meters with the associated sealing kits, delivered in six lots to circle stores. Two lots were accepted on a delivery note alone; the stores inspection report for those lots has not been produced.
Materials ManagementRs1,044,000,0001 Feb 2026 – 30 Nov 20261 alerts
GEPCO/MM/ACSR/2026-11
Kohinoor Conductors Ltd
Supply of ACSR Dog and Rabbit conductor against the annual plan for all six operation circles. Delivered against rate escalation on aluminium; the escalation claim is supported but the base index date cited does not match the contract.
Materials ManagementRs763,000,0001 Nov 2025 – 31 Oct 20261 alerts
GEPCO/GRT/LT-AB/2026-05
Chenab Line Constructors
Conversion of 72 km of bare low-tension overhead network to aerial bundled cable across seven feeders in Gujrat, under the loss-reduction programme.
Gujrat Operation CircleRs289,000,00020 Jan 2026 – 20 Dec 20261 alerts
GEPCO/HFZ/OM-VEH/2025-31
Sarwar Transport Services
Hiring of 18 vehicles with drivers for operation and maintenance duty in Hafizabad circle on a monthly rate. Contract term ends in 38 days with no re-tender advertised.
Hafizabad Operation CircleRs64,800,00014 Jul 2025 – 14 Jul 20261 alerts
GEPCO/MBD/CIVIL-GS/2025-19
Jhelum Valley Builders
Boundary wall, control room and drainage works at Phalia 66 kV grid station. Physically complete; the final bill is held against an unresolved defect list from the handover inspection.
Mandi Bahauddin Operation CircleRs78,500,0005 May 2025 – 30 Apr 20261 alerts
GEPCO/NRW/TP-SAFE/2026-02
Frontier Safety Supplies
Supply of tools, plant and linesman safety equipment for Narowal circle, including rubber gloves, earthing sets and insulated hand tools.
Narowal Operation CircleRs41,300,00015 Jan 2026 – 31 May 20260 alerts
GEPCO/GRT/HW-QTN/2026-07
Tariq Electric Store
Supply of 11 kV pin insulators, cross-arms and line hardware to the sub division stores of Gujrat circle. Awarded as nine separate quotation packets to one supplier within a single quarter, each packet falling just under the ceiling above which open competitive bidding is required.
Gujrat Operation CircleRs21,600,0008 Jan 2026 – 30 Jun 20260 alerts
GEPCO/PND/LOAD-SUR/2026-06
Meridian Power Consultants
Load flow study and ten-year distribution expansion plan for the Gujranwala, Gujrat and Sialkot circles. Second deliverable is overdue and the monthly progress reports have not been filed since March.
Planning and DesignRs52,700,0001 Dec 2025 – 30 Nov 20262 alerts
GEPCO/CON/11KV-NEW/2026-04
Ravi Power Construction Co.
Construction of 31 km of new 11 kV line and 22 pole-mounted substations under the rural electrification programme across Wazirabad and Nowshera Virkan.
Construction CircleRs337,000,0002 Mar 2026 – 28 Feb 20272 alerts

Invoices, findings, and contract scenarios shown are simulated for demonstration purposes and do not represent actual vendor conduct.